Our Process & F.A.Q

Learn the steps of Inoutside’s end-to-end process.

Mallee Design with Kitchenette & Bathroom

Our Process Timeline

The entire journey from order to completion typically spans just 9-12 weeks in total.

  • Choose your preferred size / design along with your choice of exterior cladding & colours then submit your for a quote!

    It's that simple, have fun bringing your studio to life!

    • Review and accept quote once approval has been completed.​

    • 50% deposit on order with approved plans

    • Inoutside schedule into our workshop and provide a delivery date.

  • Regulations, Approvals  

    Before any Fabrication can start, you'll need to obtain the necessary local council approvals. These requirements vary depending on your State. Although this may seem daunting, don't worry, we'll assist you through this process to ensure everything is smooth. We will provide you with all the required documents to support your permit application.  Please note: Price does not include engineering reports or approvals if required by your local council (see below).

    SA - Approvals Process

    ​The steps to obtaining the approvals are as follows:

    1. Inoutside invoice you for floor plans, soil report and engineering

    2. Floor plans sent to you for sign off before we send to the engineer

    3. All Documents are sent to the Certifier who will make contact with you and work with you to obtain the relevant approvals.

    4. Once approved Inoutside send the revised proposal/quote agreement for you to sign

    • **Approvals WILL be required due to the 2.5m total height restrictions

    • Approvals cost in SA approx. $2,000 - $3,000. Covering; floor plans, soil report, engineering, private certifier and council fees.

    • Inoutside use a private certifier (and not Council) for approvals

    • Class 1A has to be 900m off Boundary, Class 10A has to be 600m Off Boundary

    Ground Preparation and Foundations

    Preparing for the installation of your studio is easy. You mainly need to have the designated area ready, but there's usually no extensive ground preparation required thanks to our specialised footing system. Simply ensure you have the space for your chosen floorplan, and we'll take care of the rest during the installation and assembly process.

  • Fabrication begins on your studio! Once your order has been processed, your studio is meticulously built in a controlled factory environment to your specifications. Here, each element is crafted with care, all without the risk of weather delays or missing contractors.

     

    Fabrication typically takes 6-8 weeks* 

    40% Invoice due

  • Your prefabricated room will be delivered in flatpack to your site. ready for installation. ​

     

    Our prefabricated rooms arrive in flatpacks, ready for seamless installation on your property.

    The entire journey from order to completion typically spans just 9-12 weeks in total.

    Installation includes the delivery and structural installation of the build: 

    • Footings

    • Base and subfloor / Walls / Roof

    • All Cladding, Gutter and Flashings

    • Windows & Doors​

    Final 10% invoice issued on work completed.

Our Project Process Timeline Diagram

F.A.Q

Metro Only Areas (50km Radius)
Service
Adelaide
Delivery, Installation & All Internal works
Sydney
No Service
Melbourne
No Service
Canberra
No Service
TAS
No Service
WA
No Service
QLD
No Service

Get Started
with Inoutside Today

Or contact us – we’re here to help answer any questions.

bottom of page